Skip to content
Jet Research Aviation Consultants

[C-11]Freighter conversions

Freighter conversions

A passenger to freighter conversion rebuilds the aircraft around a new door and floor. Jet Research represents the owner at the conversion facility from induction to redelivery.

8
Freighter Conversion projects

2015 to 2024

2
Countries

For this work

3
Aircraft families

For this work

600
Projects in the full log

2015 to 2024

[C-11.1]Scope

What the work covers.

  1. 01InductionCondition and records baseline established before conversion begins.
  2. 02Conversion oversightStructural work, door installation and systems changes followed against the supplemental type certificate data.
  3. 03Concurrent maintenanceHeavy check work done alongside the conversion managed as one scope.
  4. 04RedeliveryWeight and balance, test flight and documentation checked before acceptance.
Two airliners in docking in a heavy maintenance hangar
C-11 / Technical oversight
[C-11.2]Deliverables

What the client receives.

Reports are written to be acted on, and to stand up if they are ever read by the other side.

  1. 01Progress reports
  2. 02Findings register
  3. 03Redelivery acceptance report
[C-11.3]From the project log

8 logged. Where the experience sits.

Aircraft families with the most freighter conversion projects in the firm's log, 2015 to 2024.

6
737 Next Generation
1
A320
1
A330
[EW]If it becomes a dispute

The same work, on the record.

The people who do this work every week also give expert opinions on it in litigation, arbitration and insurance matters.

[00]Start here

Put the aircraft on the record.

A transaction to close, a redelivery in dispute, or a case that needs a technical opinion. One call reaches the people who do the work.