Skip to content
Jet Research Aviation Consultants

[C-02]Lease acceptances

Lease acceptances

The condition accepted on day one is the condition the lessee answers for at return. Jet Research inspects the aircraft and its records against the delivery conditions before the acceptance certificate is signed.

57
Aircraft Acceptance projects

2015 to 2024

7
Countries

For this work

10
Aircraft families

For this work

600
Projects in the full log

2015 to 2024

[C-02.1]Scope

What the work covers.

  1. 01Delivery condition reviewLease delivery conditions and any side letters reduced to a checklist the inspection follows.
  2. 02Aircraft inspectionStructure, systems, cabin configuration and installed equipment verified against the specification.
  3. 03Records and statusCertified status lists, component records and modification status checked for gaps before acceptance.
  4. 04Acceptance flight and ground testsResults witnessed and discrepancies raised while the lessor can still correct them.
Two inspectors walk out of a hangar toward a parked airliner
C-02 / Transactions
[C-02.2]Deliverables

What the client receives.

Reports are written to be acted on, and to stand up if they are ever read by the other side.

  1. 01Acceptance discrepancy list
  2. 02Delivery condition report
  3. 03Baseline photo record for the future return
[C-02.3]From the project log

57 logged. Where the experience sits.

Aircraft families with the most aircraft acceptance projects in the firm's log, 2015 to 2024.

18
CRJ
13
A321
6
737 Next Generation
5
Dash 8

[00]Start here

Put the aircraft on the record.

A transaction to close, a redelivery in dispute, or a case that needs a technical opinion. One call reaches the people who do the work.